University of Haifa
Faculty of Education, Computer Science and MBA Bldg., approx. 15,000 sq.m., approx. 800 cooling tons.
Design of air conditioning and sanitation facilities for Multi-Purpose Bldg., Stair Bldg., Eshkol Tower, routine consultancy and design for air conditioning facilities at the campus.
Air conditioning system for Stair Bldg. – approx. 320 cooling tons.
Talia Dorms – 10 dorm structures, approx. 430 housing units, including central structure, auditorium, computer center, supermarket, offices.
Student House – approx. 5500 sq.m. VAV 320 cooling tons system.
Brain study and sciences labs – 2100 sq.m.
Expansion of library – 7100 sq.m., air conditioning and ventilation facilities, approx. 390 cooling tons.
Renovation of library – approx. 5000 sq.m., air conditioning, ventilation and smoke removal facilities.
Upgrading of energy center at main building – 1300 cooling tons, through water compression.