Grand Casino Marriott
Design of air conditioning, sanitation and fire control facilities for casino hall at the Marriott Hotel in Bucharest, at area of approx. 2,500 square meters. Energy center of 200 cooling tons using 4 pipe-system with air cooled compressors. The structure includes gambling halls with roulette machines, slot machine, kitchen, janitors and control rooms, showers, refrigeration rooms, ventilation and heating facilities. The scope of the project: 1.45 million Euro.